[PDF&VCE] New Lead2pass SAP C_TADM70_73 New Questions Free Download

2016 October SAP Official New Released C_TADM70_73 Dumps in Lead2pass.com!

100% Free Download! 100% Pass Guaranteed!

2016 latest released SAP official C_TADM70_73 exam question free download from Lead2pass! All new updated questions and answers are real questions from SAP Exam Center!

Following questions and answers are all new published by SAP Official Exam Center: http://www.lead2pass.com/c-tadm70-73.html

QUESTION 1
Every R3LOAD process needs a command file to start a data export, which programs generate the command files?
Which statement is false?

A.    R3SETUP
B.    SAPINST
C.    R3LDCTL
D.    MIGMON

Answer: C

QUESTION 2
The ”split” parameter defines the size limit for

A.    JPKGCTL packages
B.    JLOAD packages

Answer: B

QUESTION 3
Which table contains short description in various languages?

A.    DARTT
B.    TS<DBS>
C.    DDART
D.    DFACT

Answer: A

QUESTION 4
Every R3LOAD process needs a command file to start a data export or import. How do the programs know how many command files to create if no table splitting is involved?

A.    From *.EXT file
B.    From *.STR file

Answer: B

QUESTION 5
A productive system can be ?

A.    All are true
B.    An ABAP Web AS with an JAVA Add-in
C.    A stand-alone ABAP system
D.    An ABAP Web AS with a JAVA web AS

Answer: A

QUESTION 6
Which statement are correct for ”NZDT/MDS ” Features”.?

A.    NZDT Workbench used as a central migration controller
B.    Trigger-based logging of table changes in the source system
C.    NZDT Workbench used as a central migration controller
D.    Flexible migration scenarios with or without R3LOAD based export of remaining tables

Answer: ABCD

QUESTION 7
The file ”LABELIDX.ASC” and the ”LABEL.ASC” files are generated during the

A.    Import of the target database
B.    Export of the source database

Answer: B

QUESTION 8
Which Statement is wrong regarding ”ROWID table splitting limitations?

A.    ROWID Splitted tables MUST be imported with the “-load procedure fast” option of R3Load.
B.    ROWID Splitted tables works for transparent and non-partitioned tables.
C.    ROWID Splitted tables can be used if the target database is a non oracle database.
D.    ROWID Splitted tables must be performed during downtime of the SAP system.

Answer: C

QUESTION 9
While procuring new hardware which of the following points to be considered?

A.    Resources requirements for the next upgrade should be taken into consideration
B.    The sizing of the new system must be oriented toward performance optimization of the SAP system and the new database
C.    The new hardware must support the required operating system version for the SAP release and database
D.    The OS/DB Migration of production SAP system must performed on SEPARATE hardware

Answer: ABCD

Lead2pass offers the latest SAP C_TADM70_73 exam questions and answers in PDF & VCE. We promise 100% C_TADM70_73 exam pass or full money back (Have a try- If success, you will get a high pay job! Failed, nothing, money back!)! We provide instant download of our C_TADM70_73 dumps after payment so you can study earlier than others!

C_TADM70_73 new questions on Google Drive: https://drive.google.com/open?id=0B3Syig5i8gpDZm91M0EtbkhjZGs

2016 SAP C_TADM70_73 exam dumps (All 105 Q&As) from Lead2pass:

http://www.lead2pass.com/c-tadm70-73.html [100% Exam Pass Guaranteed]

You may also like